Reports & pricing

Clear reports. Expert insight. Confident decisions.

Choose the environmental report that fits your site and project. Every professional report starts with a defined boundary, brings the relevant evidence together and is technically reviewed before issue.

UK site-specific scope Clear standard turnaround Consultant reviewed
Illustrative mapped UK site boundary Illustrative Site Reports Direct professional report Professional review
Choose your report

Fixed standard pricing for defined online scopes.

Standard online packages apply to qualifying UK sites up to 5 hectares. If the site or instruction needs something different, we review the scope before any additional work is authorised.

Phase 1

Phase 1 Desktop Study

Planning, acquisition and preliminary contaminated-land risk assessment

£795+ VAT
Includes
  • Historical mapping review
  • Environmental setting review
  • Planning and property-use context
  • Preliminary conceptual site model
  • Consultant conclusions and next steps
Standard turnaround10 working days
Start with a free site check
Mining risk

Coal Mining Risk Assessment

Development where coal-mining legacy needs a dedicated planning assessment

£495+ VAT
Includes
  • Coal-mining setting review
  • Recorded mining features and legacy context
  • Development implications
  • Risk categorisation
  • Consultant conclusions and recommendations
Standard turnaround8 working days
Start with a free site check
Combined assessment

Combined Phase 1 and CMRA

Projects requiring both land-contamination and coal-mining assessment

£1,145+ VAT
Includes
  • Full Phase 1 Desktop Study scope
  • Coal Mining Risk Assessment scope
  • One mapped site boundary
  • Coordinated technical interpretation
  • Clear combined next steps
Standard turnaround12 working days
Start with a free site check

Standard online pricing is subject to scope review. Site walkovers may require additional travel arrangements for some locations. Any additional cost is agreed before work proceeds.

Compare report contents

See the difference at a glance.

Not every project needs every assessment. The comparison below shows how the standard report packages differ.

Report contentPhase 1 DesktopPhase 1 + WalkoverCMRACombined Phase 1 + CMRA
Historical mapping reviewPast land use and material change over time
Environmental settingRelevant contamination, water, ground and surrounding context
Planning and property-use contextProject use considered alongside environmental evidence
Consultant interpretationProfessional judgement rather than raw search output
Site reconnaissancePhysical walkover and photographic observations
Coal-mining assessmentMining legacy, features, implications and recommendations
Controlled PDF issueVersioned professional report suitable for project records
Who the reports are for

Built for the people making property and planning decisions.

Property owners

Understand potential environmental constraints before development, refinancing or a change of use.

Developers

Identify issues early enough to inform planning strategy, programme and further investigation.

Planning teams

Obtain a structured technical assessment that connects site evidence with the proposed development.

Professional advisers

Give clients and stakeholders a clearer site-specific evidence base for due diligence and next steps.

What you receive

A report designed to be read, understood and acted on.

Environmental due diligence is only useful when the evidence and the conclusion stay connected. Our report structure keeps the mapped site, reviewed evidence, limitations and consultant recommendations together.

Follow the worked example →

Professional PDF

A controlled, easy-to-read issued document.

Mapped boundary

The assessed site remains the spatial reference.

Evidence trail

Historical and environmental context is summarised clearly.

Consultant conclusion

Material findings are interpreted, not merely listed.

Proportionate next steps

Recommendations are tied back to the evidence and project.

Secure delivery

Reports are issued through the controlled project workflow.

Need help choosing the right report?

Start with the free site check for an initial indication, or send us the planning condition or project brief and we can help identify the appropriate route.